Objectives
Renewed public areas: 450,000 square metres
City parks: 250,000 square metres
Underground parking facilities: 45,000 square metres
Buildings (infrastructure / shopping / residential): 18,000 square metres
Cycling track extension / Mobile pedestrian bridge: 9,460 m
Executive Summary
Integrated urban and environmental renewal intervention with a strong environmental upgrading component aiming to enhance the quality of urban living and to enhance the role of the area’s structuring landmark features (the Lima River, and Atlantic waterfront, and the Santa Luzia Mount) and their interconnection with the city.